[00:00:02]
TO THIS MORNING'S PLANNING COMMISSION MEETING. I'M GOING TO CALL THIS MEETING TO ORDER.
[1. CALL TO ORDER]
CAN WE START WITH THE PLEDGE OF ALLEGIANCE, PLEASE? OF ALLEGIANCE].THANK YOU. ROLL CALL COMMISSIONERS. COMMISSIONER TATUM.
HERE. COMMISSIONER ERRECA. HERE. VICE CHAIRMAN RAMIREZ.
HERE. CHAIRMAN SPYCHER. HERE. AND COMMISSIONER JAWAD DID EXCUSE HIMSELF.
AND, MR. CHAIR, YOU HAVE A QUORUM. THANK YOU.
[4. APPROVAL OF MINUTES]
MOVING FORWARD, WE'RE GOING TO MOVE ON TO APPROVAL OF MINUTES.HAS ANYONE READ THE MINUTES AND LIKE TO MAKE THAT MOTION.
I'LL MAKE THE MOTION TO APPROVE. WE HAVE A MOTION.
SECOND. AND A SECOND. ALL IN FAVOR SAY AYE. AYE.
OPPOSED? PASSES UNANIMOUSLY. NOW WE'RE GOING TO MOVE ON TO CITIZEN COMMUNICATION.
AT THIS POINT OF THE MEETING, IF THERE'S SOMETHING THAT'S NOT ON TODAY'S AGENDA AND YOU'D LIKE TO COME UP AND SPEAK, NOW WOULD BE YOUR TIME TO DO SO. SEEING NONE, WE'RE GOING TO CLOSE CITIZEN COMMUNICATION AND MOVE ON TO PUBLIC HEARING,
[6. PUBLIC HEARING(S)]
CONDITIONAL USE PERMIT NUMBER CUP25-005. I NEED TO RECUSE MYSELF.VICE CHAIR RAMIREZ IS GOING TO TAKE OVER. I HAVE A FAMILY INTEREST IN THIS ONE, SO YOU GUYS CAN.
I'M GOING TO. I'LL LEAVE THE ROOM, AND THEN THEY'LL COME GET ME WHEN WE'RE DONE. THANK YOU. THANK YOU, CHAIRMAN SPYCHER. OKAY, SO WE'RE GOING TO MOVE ON TO LIKE CHAIRMAN SAID CUP25-005.
GOOD MORNING. THANK YOU. COMMISSIONERS. [INAUDIBLE] GOOD MORNING.
THANK YOU. COMMISSIONERS. MY NAME IS YANIRI PIZA, AND I'M THE PROJECT PLANNER FOR CONDITIONAL USE PERMIT NUMBER CUP 25-005 FOR NITRICITY DELHI. THIS PROPOSED PROJECT WAS CONTINUED FROM THE JULY 9TH PLANNING COMMISSION.
STRUCTURES INVOLVED IN THE OPERATION INCLUDE A 12,000 SQUARE FOOT PROCESSING AND STORAGE BUILDING, A 12,000 SQUARE FOOT WAREHOUSE, A LOADING DOCK AND COVERED CANOPY, AND OCCUPY AN OFFICE SPACE.
THE PROPOSED PROJECTS. ADDITIONAL IMPROVEMENTS INCLUDE INTERIOR IMPROVEMENTS WITH THE CONSTRUCTION OF DRY STORAGE FOR ALMOND SHELLS AND INSTALLATION OF A GRINDING AND SIEVING STATION, AND EXTERIOR IMPROVEMENTS WITH THE INSTALLATION OF MECHANICAL, AGRICULTURAL, INDUSTRIAL EQUIPMENT SUCH AS A MIXING AND PACKAGING AREA, INTERCONNECTED EXTRACTION TANKS, AIR PURIFICATION SYSTEM AND OTHER UTILITY UPGRADES.
ALL THESE IMPROVEMENTS WOULD BE WITHIN A 6 MONTH TENANT IMPROVEMENT TIMELINE BEGINNING IN THE SUMMER OF 2025, AND WOULD END AROUND DECEMBER 2025. THIS IS THE VICINITY OF THE PROJECT SITE.
THE 2 BUILDINGS THAT WOULD BE UTILIZED ARE LOCATED ON THE SOUTHEAST OF THE PROJECT SITE.
THE TWO BUILDINGS LOCATED ON THE NORTHEAST ARE NOT INCLUDED IN THE PROPOSED FERTILIZER FACILITY OPERATION, BUT IS INCLUDED IN THIS IMAGERY AS IT INCLUDES SHARED ACCESS TO CIRCULATION OF THE SITE.
THE PROJECT SITE IS ON WELL AND ON SITE SEPTIC SYSTEM.
THERE ARE 2 ACCESS POINTS, ONE ON PINEWOOD STREET AND ONE ON COLLIER ROAD.
HERE IS THE SITE PLAN OF THE PROPOSED FERTILIZER FACILITY.
IN ADDITION TO WHERE IMPROVEMENTS WILL BE OCCURRING IN THE INTERIOR AND EXTERIOR OF THE STRUCTURES, SUCH AS A SMALL CONSTRUCTION IN THE INTERIOR FOR STORAGE, A DRY STORAGE FOR ALMOND SHELLS, AND UPGRADES TO SUPPORTING UTILITIES ON THE INTERIOR AND EXTERIOR OF BUILDINGS.
THE SITE HAS 35 AVAILABLE PARKING SPACES, WITH 33 BEING STANDARD AND 2 BEING ACCEPTABLE.
[00:05:10]
THE PROJECT IS CONSISTENT WITH GENERAL PLAN GOAL AND POLICIES REGARDING AGRICULTURAL DESIGNATION, AGRICULTURAL SUPPORT FACILITIES AND INDUSTRIAL USES.THE PROJECT SITE IS ALSO ZONED A-1 GENERAL AGRICULTURAL.
THE PROJECT IS CONSISTENT WITH THE APPLICABLE PROVISIONS OF THE ZONING CODE, AND MAY BE PERMITTED IN THE A-1 ZONE, SUBJECTED TO APPROVAL OF A CONDITIONAL USE PERMIT.
THANK YOU. COMMISSIONERS. REGARDING PUBLIC COMMENT, SO NO PUBLIC NOTICE FOR THIS ITEM WAS PUBLISHED IN THE MERCED COUNTY TIMES AND MAILED TO PROPERTY OWNERS WITHIN 300FT OF THE PROJECT SITE ON JUNE 26TH FOR THE JULY 9TH MEETING.
WHEN WE RECEIVED WE THE FORMAL COMMENT LETTER ON JULY 9TH, WE ISSUED A NEW RESPONSE COMMENT AS PART OF OUR PUBLICATION OF THE STAFF REPORT. AND THEN AFTER CLOSE OF BUSINESS YESTERDAY, JULY 22ND, WE RECEIVED AN ADDITIONAL LETTER FROM LEADERSHIP COUNCIL DATED JULY 21ST, 2025 VIA EMAIL. A COPY OF THIS LETTER HAS BEEN PROVIDED TO THE DAIS, AND ADDITIONAL COPIES ARE AVAILABLE ON THE TABLE AT THE ENTRANCE OF THE PLANNING COMMISSION CHAMBERS. BECAUSE THIS LETTER WAS RECEIVED LAST MINUTE.
STAFF WAS NOT ABLE TO UPDATE THIS PRESENTATION TO REFLECT ITS CONTENTS.
NEXT SLIDE PLEASE. SO THE CONTENTS OF THE ORIGINAL LETTER KIND OF BREAKS DOWN LEADERSHIP COUNCIL'S 3 PRIMARY CONCERNS, WHICH IS THAT THE PROJECT HAS UNDISCLOSED IMPACTS, SPECIFICALLY THOSE RELATED TO WATER, ELECTRICITY USAGE, NITROGEN OXIDE EMISSIONS, TRANSPORTATION RELATED EMISSIONS, HANDLING OF HAZARDOUS MATERIALS.
BECAUSE OF THESE REASONS, THE PROJECT IS NOT EXEMPT FROM CEQA.
ALSO, BECAUSE THE PROJECT IS GOING TO BE A CHANGE OF USE AND DOES HAVE SOME IMPROVEMENTS INVOLVED THAT THE LEADERSHIP COUNCIL BELIEVES THAT THE PROJECT IS NOT EXEMPT FROM CEQA, AND SINCE BECAUSE IT'S NOT EXEMPT FROM CEQA, THE COUNTY SHOULD HAVE AND COMPLETE A FULL ENVIRONMENTAL REVIEW FOR THIS PROJECT.
NEXT SLIDE. IN THE COUNTY'S INITIAL RESPONSE TO THIS LETTER, SEEN AS ATTACHMENT G, WE DID NOTE THAT THE PROJECT IS NOT LOCATED IN THE URBAN COMMUNITY OF DELHI. IT IS LOCATED IN THE AGRICULTURAL AREAS OUTSIDE OF DELHI, ABOUT 0.75 MILES SOUTH OF THE URBAN COMMUNITY BOUNDARY, WATER DEMAND WOULD ACTUALLY BE REDUCED FROM THE PRIOR AGRICULTURAL INDUSTRIAL PROCESSING FACILITY, AND IT WOULD BE UTILIZING RENEWABLE ENERGY UNLIKE THE PREVIOUS USAGE.
SO ALTHOUGH ENERGY USAGE WOULD BE INCREASING, THE OFFSET WOULD BE RENEWABLE ENERGY.
AS FAR AS EMISSIONS, THE APPLICANT IS WORKING WITH A DISTRICT OR AIR PERMITTING ENGINEER AND WORKING WITH THE AIR DISTRICT TO ENSURE THAT THEIR OPERATIONS DO COMPLY WITH THE AIR DISTRICT STANDARDS FOR QUALITIES, SO THEY WILL BE UTILIZING BEST AVAILABLE CONTROL TECHNOLOGIES, WHICH WILL MINIMIZE EMISSIONS AND WOULD NOT RESULT IN HARMFUL IMPACTS TO THE SURROUNDING AREA.
AS FAR AS TRANSPORTATION EMISSIONS, THOSE WOULD BE LESS THAN SIGNIFICANT AS THE PROJECT WOULD HAVE SIGNIFICANT LESS VEHICLE TRIPS ASSOCIATED WITH THE PROJECT, SPECIFICALLY, LESS THAN 2 TRUCK TRIPS PER DAY.
APPROXIMATELY 1.67 TRIPS MEAN THAT SOME DAYS THEY MIGHT NOT RECEIVE 2 TRIPS THEY MIGHT HAVE LESS THAN THAN 2, RIGHT? AND THEN FINALLY, AS FAR AS USING HAZARDOUS MATERIALS BUSINESS PLAN IS REQUIRED FOR ANY PROJECT THAT HAS A CERTAIN AMOUNT OF CHEMICALS THAT ARE USED, INCLUDING HOUSEHOLD CLEANERS.
SO IN THAT WITH REQUIREMENT OF AND COMPLYING WITH OUR HAZARDOUS MATERIAL BUSINESS PLAN PROCESS, THEY WOULD HAVE SAFE STORAGE AND HANDLING OF THOSE CHEMICALS.
NEXT SLIDE. REGARDING THE PROJECT NOT BEING EXEMPT FROM CEQA, THE PROPOSED PROJECT IS AN AGRICULTURAL PROCESSING FACILITY, ALMOST AS A FERTILIZER PLANT. THE FACILITY WOULD OPERATE IN EXISTING STRUCTURES AND THE IMPROVEMENTS THAT ARE MADE ARE UTILITY IMPROVEMENTS WITH SOME MECHANICAL EQUIPMENT'S TO ASSIST WITH PRODUCTION OF THEIR PROPERTIES.
THE PROJECT IS RELATIVELY SMALL IN SCALE, AS OPPOSED TO OTHER WELL KNOWN FERTILIZER FACILITIES.
[00:10:07]
HANDLING OF HAZARDOUS MATERIALS AND AIR PERMITS.NEXT SLIDE. AND FOR ALL THOSE REASONS, BECAUSE WE BELIEVE IT IS CATEGORICALLY EXEMPT, IT'S DEALING WITH MINOR ALTERATIONS TO EXISTING FACILITIES, MOSTLY UTILITY UPGRADES AND USING MECHANICAL EQUIPMENT THAT IS TYPICAL OF AGRICULTURAL INDUSTRIAL PROCESSING PLANTS, THAT ENVIRONMENTAL ANALYSIS IS NOT REQUIRED. NOW I'LL MOVE ON TO THE LETTER THAT WAS RECEIVED YESTERDAY EVENING AFTER CLOSE OF BUSINESS, WHICH KIND OF SUMMARIZED IN TO 3 LARGE PARTS.
THEREFORE, HEALTH RISK IMPACT HAS NOT BEEN QUANTIFIED AND WE SHOULD NOT BE STATING THAT THERE WON'T BE HEALTH IMPACTS AND THAT A CUMULATIVE ERROR ANALYSIS SHOULD HAVE BEEN REQUIRED. IN REGARDS TO THAT, THE COUNTY DOES RECOGNIZE THAT THE AIR DISTRICT HAS THE SCOPE AND JURISDICTION OF AIR QUALITY AND AIR QUALITY EMISSIONS IN THE SAN JOAQUIN VALLEY. THEREFORE, ALL THE PROCESSES THAT THEY'RE WORKING THROUGH THAT THE APPLICANT AND YORKE ARE WORKING THROUGH HAVE CONDUCTED ANALYSIS, ARE IN LINE WITH THE AIR DISTRICT'S PROCESSES.
SO THEY HAVE MADE AN INFORMED ESTIMATED GUESS THAT THERE WOULD NOT BE A HEALTH RISK IMPACT, WHICH WILL HAVE TO BE VALIDATED BY THE AIR DISTRICT.
AND IF IT IS NOT VALIDATED BY THE AIR DISTRICT, THE AIR DISTRICT CANNOT ISSUE THEIR AUTHORITY TO CONSTRUCT, WHICH MEANS THEY CANNOT OPERATE. SO REGARDLESS OF WHETHER THE PLANNING COMMISSION DOES APPROVE THIS PROJECT, THIS PROJECT COULD NOT OPERATE IF THE AIR DISTRICT DOES NOT ISSUE ITS APPROVALS.
AND THEN A CUMULATIVE ANALYSIS IS NOT REQUIRED BECAUSE, AS DISCUSSED IN YORKE'S LETTERS AND AS DISCUSSED IN THEIR CONCLUSIONS, THE PROJECT DOES NOT EXCEED THE THRESHOLDS OF SIGNIFICANCE THAT ARE SET BY THE ER DISTRICT.
THAT STILL DOESN'T GUARANTEE THAT THEY WOULD CONSTITUTE A SIGNIFICANT CUMULATIVE IMPACT.
THE ADDITIONAL POINTS THAT THE COMMENT LETTER STATES IS THAT THE PROJECT IS NOT SIMILAR TO THE PRIOR AGRICULTURAL PROCESSING USE, BECAUSE THEY ARE CONSTRUCTING NEW THINGS WITH INSIDE THEIR BUILDING AND INSTALLING NEW MECHANICAL EQUIPMENT.
SPECIFICALLY CITING AN ARTICLE THAT THE NITRICITY WOULD BE USING BIOMASS AND HEAT WITH RENEWABLE ELECTRICITY, BIOMASS AND HEAT IS NOT AN ELECTRICAL USAGE. THAT'S KIND OF THE ADDITIVES TO THE PROCESS.
AND THE AS STATED IN THAT ARTICLE, THEY WILL BE USING RENEWABLE ENERGY.
THEREFORE WE BELIEVE THAT THIS PROJECT SHOULD NOT HAVE ANY SIGNIFICANT ENVIRONMENTAL IMPACTS WOULD FALL WITHIN THE ENVIRONMENTAL CEQA EXEMPTION CRITERIA AND THEREFORE NO FURTHER ENVIRONMENTAL REVIEW IS REQUIRED.
THAT CONCLUDES THE COMMENTS RECEIVED ON THIS PROJECT AS WELL AS THE COUNTY'S RESPONSES.
NOW, I'LL MOVE BACK TO YANIRI. YOU CAN PRESENT ON THE REST OF THE PROJECT.
FOR ENVIRONMENTAL REVIEW STAFF RECOMMENDS THAT THE COMMISSION FINDS THAT THE PROJECT IS CATEGORICALLY EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15301 EXISTING FACILITIES AND SECTION 15303 NEW CONSTRUCTION OR CONVERSION OF SMALL STRUCTURES AS A PROPOSED PLANT BASED ORGANIC FERTILIZER FACILITY WOULD OPERATE WITHIN EXISTING STRUCTURES THAT MADE UP A FORMER AGRICULTURAL FACILITY.
STAFF HAS 2 RECOMMENDATIONS. DETERMINE THE PROJECT IS CATEGORICALLY EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15301 EXISTING FACILITIES AND SECTION 15303 A NEW CONSTRUCTION OR CONVERSION OF SMALL STRUCTURES OF THE CEQA GUIDELINES AND APPROVE CONDITIONAL USE PERMIT NUMBER CUP 25-005. BASED ON THE FINDINGS INCLUDED IN THE STAFF REPORT AND SUBJECT TO THE RECOMMENDED CONDITIONS OF APPROVAL.
THIS NOW CONCLUDES STAFF PRESENTATIONS. I'M AVAILABLE FOR QUESTIONS.
THANK YOU. COMMISSIONERS. HAVE ANY QUESTIONS FOR STAFF? MR. CHAIR, IF I CAN JUST ASK ONE. AND THAT IS IRRESPECTIVE OF WHETHER WE APPROVE OR DISAPPROVE.
[00:15:02]
YOUR DISTRICT HAS THE FINAL REALLY SAY OVER WHETHER OR NOT.SO AS PART OF THIS PROCESS, ANY DEVELOPMENT PROCESS.
ANY PROJECT ACTUALLY HAS TO GET A NUMBER OF DIFFERENT PERMITS.
THE AIR DISTRICT PERMITS AUTHORITY TO CONSTRUCT IS JUST ONE OF THEM.
THEY COULD NOT OBTAIN ANY OF THE COUNTY'S BUILDING PERMITS, NOR COULD THEY OBTAIN THEIR BUSINESS LICENSE AND FULFILL A CONDITIONAL USE PERMIT IF THEY WERE TO GET APPROVED FOR THIS CONDITIONAL USE PERMIT.
[INAUDIBLE]. ANY MORE? NO. OKAY. AT THIS TIME, I'D LIKE TO OPEN UP THE PUBLIC HEARING.
SO ANYBODY WOULD LIKE TO SPEAK ON THIS, CAN COME UP STATE YOUR NAME, YOUR ADDRESS.
GOOD MORNING EVERYONE. MY NAME IS ANDREA URIBE.
AND I'D LIKE TO START OFF BY SAYING THANK YOU TO THE MADERA COUNTY STAFF MEMBERS AND THE MEMBERS OF YOUR ENGINEERING WHO TOOK TIME TO RESPOND TO OUR COMMENT LETTER THROUGH THE MEMO AND CHART. AND NOW THROUGH THIS PRESENTATION, WE APPRECIATE THE COMMITMENT TO ADDRESS COMMUNITY CONCERNS.
0.6 OF YORKE'S ENGINEERING STATES THAT THERE NEEDS TO BE A HEALTH RISK ASSESSMENT TO BE COMPLETED, AND WE WOULD LIKE TO ASK THE COMMISSIONERS TO WAIT UNTIL THE HEALTH RISK ASSESSMENT IS COMPLETED BEFORE MOVING FORWARD WITH THE PROJECT.
I UNDERSTAND THAT THE PROJECT IS HAPPENING OUTSIDE OF THE RESIDENTIAL AREA OF DELHI, BUT THE EMISSIONS THAT WOULD HAPPEN WITHIN THIS FACILITY STILL HAVE THE POTENTIAL TO AFFECT THOSE LIVING WITHIN THE RESIDENTIAL COMMUNITY OF DELHI, WHICH IS LESS THAN A MILE AWAY.
FURTHERMORE THE USE WITHIN THIS FACILITY WOULD CHANGE.
WE ARE HEARING THAT THE ALTERATIONS WOULD BE MINOR, BUT I THINK THAT THE USES AND LIKE THE EMISSIONS THAT WILL BE HAPPENING TO MAKE THE FERTILIZERS FROM THE ALMOND HUSK ARE WHAT WE'RE MOST CONCERNED ABOUT AND WHAT MAKE THIS PROJECT NOT EXEMPT FROM CEQA.
AND ADDITIONALLY, I WOULD PLEASE LIKE TO ASK IF YOU CAN CONFIRM OR DENY IF THERE WILL BE BIOMASS ENERGY BEING USED IN THE PROJECT TO CARRY OUT THE CREATION OF THE FERTILIZER OR TO TO RUN THE FACILITY ITSELF, AND IF BIOMASS ENERGY WILL BE BEING USED, TO WHAT EXTENT AND IN WHAT WAYS AND AGAIN, AT THIS MOMENT, WE ASK COMMISSIONERS TO DELAY THIS PROJECT AND ITS APPROVAL UNTIL THE HEALTH RISK ASSESSMENT HAS BEEN COMPLETED. AND TO JUST KEEP IN MIND, THE RESIDENTS OF DELHI WHO COULD BE POTENTIALLY IMPACTED BY NEGATIVE EMISSIONS.
THANK YOU. THANK YOU. ANY OTHER COMMENTS? OKAY NO. GOOD MORNING. MY NAME IS KEITH NELSON.
THESE ARE SHARP, RESPONSIBLE PEOPLE DOING MEANINGFUL WORK AS BOTH ELECTRICIAN AND A FARMER.
I SEE REAL VALUE IN THE NITRICITY IS BUILDING THEIR PRODUCTION.
THAT'S A WIN FOR OUR ENVIRONMENT AND FOR GROWERS LIKE ME.
IT'S TRULY LOCAL. THEY USE ALMOND SHELLS, WATER, AIR AND RENEWABLE ELECTRICITY TO BREW FERTILIZER, AND THEY WANT TO DO IT RIGHT HERE IN MERCED COUNTY.
THAT MEANS LESS IMPORTING, LESS TRUCKING, AND MORE DOLLAR TO STAY IN OUR COMMUNITY.
IT'S CLEAN, TRADITIONAL FERTILIZER PRODUCTION.
IT'S IS A BIG GREENHOUSE GAS EMITTER WITH UP TO 5% GLOBAL EMISSIONS.
NITRICITY'S METHOD CAN CUT THAT BY 80% WHILE PRODUCING NO ODORS OR PATHOGENS.
[00:20:02]
IT'S SMART AND RESILIENT. NUTRITION GIVES FARMERS SUPPLY CHAIN SECURITY USING ITS OWN AG WASTE ALMOND SHELLS TO GROW THE NEXT SEASON'S CROPS.IT'S CIRCULAR, IT'S SUSTAINABLE, AND IT'S CALIFORNIA AGRICULTURE AT ITS BEST.
NITRICITY IS READY TO BUILD. LET'S MAKE SURE WE GET THE BENEFIT.
MY VOTE IS WE BUILD THE PLANT HERE IN MERCED COUNTY.
THANK YOU. THANK YOU. ANY OTHER COMMENTS? OKAY. OKAY. HI EVERYONE. MY NAME IS JOSH MCENANEY.
I'M THE PRESIDENT AND CTO AT NITRICITY. NITRICITY IS A SUSTAINABLE FERTILIZER COMPANY, AND WE TAKE PRIDE IN OUR PROCESS TO LOWER THE IMPACTS ENVIRONMENTAL IMPACTS OF FERTILIZER PRODUCTION AND USE. A LOT OF THE THINGS THAT I WAS GOING TO SAY HAVE KIND OF BEEN ADDRESSED BY THE STAFF'S COMMENTS.
AND THANK YOU FOR CONSIDERING OUR PROJECT, BUT JUST A COUPLE OF POINTS.
AND THE FERTILIZERS ARE EXPECTED TO BE IMPROVE YIELDS LOWER GREENHOUSE GAS EMISSIONS.
THEY DON'T SMELL BAD. THEY DON'T CONTAIN PATHOGENS. THEY ENABLE POTENTIALLY HIGH USE EFFICIENCY, WHICH MEANS MORE NITROGEN CAN GET INTO CROPS AND LESS CAN BE WASTED AS NOX OR OTHER NITROGEN WASTES.
NITRICITY IS WORKING WITH YORKE ENGINEERING AND ENVIRONMENTAL AND AIR QUALITY COMPLIANCE FIRM. AND WE DO WANT TO MAKE SURE THAT OUR EMISSIONS ARE LOW AND FIT WITHIN REQUIREMENTS AND REGULATIONS. THEY HAVE AN ENTIRE PROCESS.
AS WE DISCUSSED BEFORE, THEY ALLOW AUTHORITY TO CONSTRUCT THAT'S INDEPENDENT OF THIS PROCESS.
AND THEY WILL DO THEIR HEALTH RISK ASSESSMENT.
AND I BELIEVE THEY ACTUALLY DO ACCUMULATIVE STUDIES AS WELL TO ANALYZE AREAS OF POTENTIAL RISK.
OUR PROCESS HAS PRODUCES AGRICULTURAL PRODUCTS WITH BIOMASS WATER AND ELECTRICITY, BUT WE USE LESS WATER, LESS BIOMASS, AND THE ELECTRICITY IS NOW GREEN INSTEAD OF THE TYPICAL GRID ELECTRICITY.
AND ULTIMATELY, THIS IS A VERY SMALL PROJECT.
OUR FERTILIZER IS OR THE FERTILIZER CAPACITY THAT OUR PLANT WILL PRODUCE WILL BE ABOUT A THOUSAND TIMES SMALLER THAN TYPICAL FERTILIZER PLANTS AND 10,000 TIMES SMALLER THAN THE LARGEST FERTILIZER PLANTS. SO WE'RE TRYING TO GET ON OUR FEET WITH THIS MORE ENVIRONMENTALLY FRIENDLY PROCESS, AND WE HAVE A HISTORY OF WORKING WITH THE COMMUNITY.
WE'VE TAKEN OUR FIELD TRIAL CROPS AND THEN GIVEN THEM TO LOCAL FOOD SHELTERS.
WE'VE BROUGHT SOLAR ENERGY SYSTEMS TO FARMS THAT HAVE HELPED US TO DEVELOP.
AND WE'VE PARTNERED WITH PEOPLE LIKE PLACES LIKE MERCED COLLEGE AND THE UNIVERSITY OF MERCED, BRINGING ON 9 INTERNS THIS YEAR FOR A COMPANY OF 35.
AND WANT TO CONTINUE TO EXPAND COMMUNITY DEVELOPMENT AND ORGANIZATIONAL PARTNERSHIPS.
AND WE THANK YOU FOR YOUR TIME AND AGREE WITH THE STAFF RECOMMENDATION.
THANK YOU. THANK YOU. ANY OTHER COMMENTS? OKAY.
[INAUDIBLE] MAKE A MOTION. I'LL MAKE THAT MOTION, MR. CHAIR. THE PROJECT IS CATEGORICALLY EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15 301 AND SECTION 15 303 CONSTRUCTION OR CONVERSION OF SMALL STRUCTURES THE CEQA GUIDELINES.
SECOND. ALL THOSE IN FAVOR? AYE. AYE. ANY OPPOSED? SO MOVE. PROJECT DETERMINATION. OKAY, I'LL MAKE THE MOTION THAT WE APPROVE. CONDITIONAL USE PERMIT NUMBER CUP 25-005.
ALL THOSE IN FAVOR. AYE. AND THOSE OPPOSED. SO MOVE.
[00:25:06]
ALL RIGHT. MOVING ON. WE'RE GOING TO LOOK AT CONDITIONAL USE PERMIT NUMBER CUP 24-005.AND I AM PRESENTING ON CONDITIONAL USE PERMIT NUMBER CUP 24-005 FOR THE APPLICANT YASIR KHANSHALI.
THE REQUEST IS TO ESTABLISH, CONSTRUCT AND OPERATE A COFFEE ROASTING AND PROCESSING AND STORAGE FACILITY, WHICH WOULD CONSIST OF A 2500 SQUARE FOOT STORAGE BUILDING AND A 4500 SQUARE FOOT ROASTING BUILDING, WHICH WOULD ALSO INCLUDE A 1000 SQUARE FOOT TASTING ROOM.
THE PROJECT SITE IS LOCATED ON THE NORTHEAST CORNER OF NORTH LANDER AVENUE AND THE WEST BRADBURY AVENUE IN THE TURLOCK AREA, AND DESIGNATED AGRICULTURAL LAND USE IN THE GENERAL PLAN AND ZONED A-1 GENERAL AGRICULTURAL.
THIS SLIDE HERE IS A VICINITY MAP WITH THE PROJECT SITE HIGHLIGHTED IN RED.
THE SURROUNDING AREA IS ALSO DESIGNATED A-1 ZONING AND AGRICULTURAL LAND USE IN THE GENERAL PLAN.
THIS SLIDE HERE SHOWS AN AERIAL IMAGERY OF THE PROJECT SITE, STILL HIGHLIGHTED IN RED, WITH A MORE CLOSE UP VIEW THAT YOU CAN SEE THE DEVELOPMENT ON SITE RIGHT NOW. SO THE EXISTING SITE IS DEVELOPED WITH AN WITH A LEGAL NONCONFORMING GAS STATION AS WELL AS A SINGLE FAMILY RESIDENCE.
WATER IS PROVIDED ON SITE BY WELLS AND WASTEWATER IS MANAGED BY ONSITE SEPTIC SYSTEMS. THERE ARE ALSO ROW CROPS THAT ARE BEING LEASED OUT THAT ARE PLANTED ON THE FACILITY.
THIS SLIDE HERE IS A SITE PLAN FOR THE PROPOSED USE, WITH THE STORAGE BUILDING AND ROASTING BUILDING NORTH OF THE EXISTING CONVENIENCE STORE AND GAS STATION. THE PROJECT AGAIN INVOLVES THE CONSTRUCTION OF A 2500 SQUARE FOOT STORAGE BUILDING AND A 4500 SQUARE FOOT ROASTING BUILDING. IMPROVEMENTS THAT ARE NOT JUST THE BUILDING.
ALSO INCLUDE LANDSCAPING, DRAINAGE, A DEDICATED SEPTIC SYSTEM, TRASH ENCLOSURE, AND PARKING AREAS.
THIS SLIDE HERE SHOWS THE 4 PLANS OF THE 2 BUILDINGS.
THE KIND OF LIGHTER BLUE, NOT TEAL AREA REPRESENTS THE TASTING ROOM AREA.
SIMILAR TO HOW WE PERMIT TASTING FACILITIES FOR WINERIES, BREWERIES AND DISTILLERIES.
THE PROJECT SITE IS DESIGNATED AGRICULTURAL LAND USE IN THE GENERAL PLAN AND ZONED A-1.
GENERAL AGRICULTURAL, STAFF HAS REVIEWED THE PROJECT FOR CONSISTENCY WITH OUR GENERAL PLAN POLICIES, AS WELL AS OUR ZONING CODE STANDARDS. AND THE PROJECT WAS FOUND TO BE WITH CONSISTENT WITH OUR ECONOMIC DEVELOPMENT GOALS OF SUPPORTING AGRICULTURAL ECONOMY AS WELL AS OUR LAND USE GOALS OF PRESERVING AND PROMOTING AGRICULTURAL INDUSTRY, SPECIFICALLY THOSE THAT ARE VALUE ADDED PROCESSING INDUSTRY.
THE PROJECT IS CONSIDERED AN AGRICULTURAL PROCESSING PLANT, WHICH IS DEFINED AS COMMERCIAL OPERATIONS THAT TRANSFORM PACKAGES, SORTS AND GRADES LIVESTOCK PRODUCTS, AGRICULTURAL COMMODITIES OR PLANT PRODUCTS, EXCLUDING FOREST PRODUCTS AND CANNABIS RELATED PRODUCTS INTO GOODS FOR IMMEDIATE OR FINAL CONSUMPTION, INCLUDING NON-FOOD USES. FOR ENVIRONMENTAL REVIEW.
WE FOUND THIS PROJECT TO BE CATEGORY EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15303, NEW CONSTRUCTION OR CONVERSION OF SMALL STRUCTURES, AND THAT THE TOTAL FLOOR AREA IS LESS THAN 10,000FT².
SERVICES ARE AVAILABLE TO THE SITE. IT IS NOT ENVIRONMENTALLY SENSITIVE SITE IS CURRENTLY BEING DISTURBED BY AGRICULTURAL PRACTICES AS WELL AS SOME COMMERCIAL USES, AND THE SURROUNDING AREA HAS ALSO BEEN DISTURBED BY AGRICULTURAL SUPPORT FACILITIES, NURSERY AND SO FORTH, AND THE PROJECT WOULD NOT INVOLVE OR PRODUCE SIGNIFICANT QUANTITIES OF HAZARDOUS MATERIALS THAT COULD NOT BE MANAGED BY OUR HAZARDOUS MATERIAL BUSINESS PLAN PROCESS.
[00:30:05]
STAFF HAS 2 RECOMMENDATIONS FOR THE PLANNING COMMISSION.FIRST IS TO DETERMINE THE PROJECT IS CATEGORY EXEMPT FROM ENVIRONMENTAL REVIEW AND THEN SECOND, TO APPROVE CONDITIONAL USE PERMIT NUMBER CUP24-005.
AND I HAVE TWO PARTNERS HERE WITH. CAN YOU HEAR ME NOW? OKAY, GOOD. I'M THE DESIGNER WORKING WITH THE OWNER ON THIS PROJECT, AND I HAVE TWO OF THE PARTNERS WITH ME HERE ON BEHALF OF THE OWNER.
BASICALLY, THE OWNER HAS BEEN DOING BUSINESS IN THE VALLEY FOR THE LAST 30 YEARS, AND THEY HAVE ESTABLISHED SEVERAL MARKETS GAS STATIONS, CONVENIENCE STORES THROUGHOUT THE VALLEY, BOTH IN URBAN AND IN RURAL AREAS, AND ONE OF THEIR GOAL WAS TO EXPAND THEIR BUSINESS AND PROVIDE A SPECIALTY PRODUCT FOR THEIR CUSTOMERS. SO HENCE THE THE COFFEE ROASTING BUSINESS AND TO PACKAGE AND SELL A SPECIALTY COFFEE. THIS IS MORE OF A MORE OF A SPECIALTY COFFEE COMING FROM THE MIDDLE EAST.
THE BEANS ARE COMING FROM THE MIDDLE EAST AND INTRODUCING THAT PRODUCT TO THIS MARKET.
SO THEIR GOAL IS TO COVER THE VALLEY AND EXPAND THROUGHOUT THE CALIFORNIA WITH THIS PRODUCT.
AND HENCE WE NEED A FACILITY TO DO THAT. AND SINCE THEY OWN THE LAND HERE, THAT WAS A PERFECT LOCATION AND PERFECT SPOT TO DO THIS BUSINESS. AND WE'RE LOOKING FOR YOUR SUPPORT, AND I'LL BE HAPPY TO ANSWER ANY QUESTIONS YOU HAVE.
THANK YOU. DOES ANYBODY HAVE ANY QUESTIONS? NO.
THANK YOU SO MUCH. WOULD ANYONE ELSE LIKE TO COME SPEAK ON THIS PROJECT? SEEING NONE, I'M GOING TO CLOSE THE PUBLIC HEARING AND BRING IT BACK TO THE BOARD HERE.
WHAT IS THE DESIRE? ANY QUESTIONS? AND YOU WOULD LIKE TO MAKE A MOTION? I'LL MAKE THE MOTION A CEQA DETERMINATION. AND THE MOTION WOULD BE TO DETERMINE THE PROJECT IS CATEGORICALLY EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15303 OF SMALL BUSINESS STRUCTURES OF THE SCHOOL GUIDELINES.
THANK YOU. WE HAVE A MOTION. DO WE HAVE A SECOND? THANK YOU. WE HAVE A MOTION AND A SECOND. ALL IN FAVOR, SAY AYE.
AYE. OPPOSED? PASSES UNANIMOUSLY. NOW MOVING ON TO THE PROJECT DETERMINATION.
CUP NUMBER 24-005 BASED ON THE FINDINGS INCLUDED IN THE STAFF REPORT AND SUBJECT TO THE RECOMMENDATION, RECOMMENDED CONDITIONS OF APPROVAL. THANK YOU.
WE HAVE A MOTION. DO WE HAVE A SECOND? SECOND.
WE HAVE A MOTION IN A SECOND. ALL IN FAVOR, SAY AYE.
AYE. NAY. PASSES UNANIMOUSLY. LOOKS LIKE A GREAT PROJECT.
THANKS, GUYS, FOR BRINGING IT TO US. MOVING FORWARD WE'RE GOING TO MOVE ON TO C.
CONDITIONAL USE PERMIT NUMBER CUP 24-016. GOOD MORNING. THANK YOU, CHAIRMAN SPYCHER. MY NAME IS RICARDO MERCADO.
THE PROJECT IS A REQUEST TO ESTABLISH A VEHICLE REPAIR FACILITY PROVIDING TIRE SERVICES, AUTO DETAILING, AND MINOR AUTO REPAIRS THAT WILL OCCUPY A 600 SQUARE FOOT SUITE WITHIN AN EXISTING COMMERCIAL BUILDING.
THERE WOULD BE A TOTAL OF THREE EMPLOYEES. ONE OF WHICH WILL BE THE THE OWNER HIMSELF.
IN THE AFTERNOON. AND THEY HAVE AN EXPECTED NUMBER OF TEN CUSTOMERS A DAY.
MOVING ON TO THE NEXT SLIDE, WE HAVE A VICINITY OF THE PROJECT SITE.
[00:35:01]
IN THE MERCED AREA. THE SURROUNDING AREAS ARE MOSTLY DEVELOPED WITH RESIDENTIAL USES TO THE NORTH AND COMMERCIAL USES TO THE EAST, SOUTH, AND WEST OF THE PROJECT AREA. THIS NEXT SLIDE, WE HAVE A MORE ZOOMED IN AERIAL VIEW OF THE OF THE PROJECT SITE.THE PROJECT SITE CONSISTS OF A PARCEL WHICH IS ALREADY DEVELOPED WITH SEVERAL OTHER COMMERCIAL USES, WHICH INCLUDE AN AUTO DETAILING BUSINESS, A VEHICLE REGISTRATION OFFICE, AND A USED CAR SALESMAN.
ACCESS TO THE PROPERTY CAN BE FOUND ALONG 21ST STREET.
THIS NEXT SLIDE IS THE PROPOSED SITE PLAN THAT THE APPLICANT PROVIDED, DISPLAYING THE LOCATION OF THE EXISTING COMMERCIAL BUILDING WHERE THE BUSINESS WILL BE PLACED IN. IT IS FOUND ON THE NORTHEAST PORTION OF THE PARCEL.
THE SITE PLAN ALSO INDICATES. THAT THERE ARE NO INTERIOR EXTERIOR ALTERATIONS THAT ARE GOING TO BE MADE TO THE TO THE SITE, AND THERE WILL BE SUFFICIENT CUSTOMER PARKING AVAILABLE ON THE PROPERTY. NEXT SLIDE.
LIKE I SAID, FOR THE RECORD, THE PROJECT SITE IS DESIGNATED IN RESEARCH, CITY PLANNING AREA, NEIGHBORHOOD, COMMERCIAL LAND USE, AND THE PROJECT CAN BE FOUND CONSISTENT WITH THE APPLICABLE GOALS AND POLICIES OF THE GENERAL PLAN BY MEETING GOAL.
LU-7 AND POLICIES LU-7.1 AND LU-7.11, AND CAN ALSO BE FOUND CONSISTENT WITH THE APPLICABLE GOALS AND APPLICABLE PROVISIONS OF THE CITY COUNTY ZONING CODE WHERE A VEHICLE REPAIR FACILITY IS ALLOWED IN THAT ZONE WITH THE APPROVAL OF A CONDITIONAL USE PERMIT PURSUANT TO 18.14.020. NOTICE OF THIS HEARING WAS PUBLISHED IN THE MERCED COUNTY TIMES ON JULY 10TH, 2025, AND MAILED TO PROPERTY OWNERS WITHIN 300FT OF THE PROJECT SITE SAME DAY, JULY 10TH, 2025. NO COMMENTS WERE RECEIVED. GIVEN ALL THE INFORMATION PROVIDED TODAY, STAFF HAS FOUND THAT THE PROJECT CAN BE FOUND CATEGORICALLY EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO INTO SECTION 15301.
STAFF HAS TWO RECOMMENDATIONS FOR THE PROJECT.
FIRST ONE WOULD BE TO DETERMINE THAT THE PROJECT IS CATEGORICALLY EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15301, EXISTING FACILITIES OF THE CEQA GUIDELINES AND SECOND RECOMMENDATION WOULD BE TO APPROVE CONDITIONAL USE PERMIT CUP24-016 BASED ON THE FINDINGS INCLUDED IN THE STAFF REPORT AND SUBJECT TO THE RECOMMENDED CONDITIONS OF APPROVAL. THIS NOW CONCLUDES STAFF'S PRESENTATION.
I'M AVAILABLE FOR QUESTIONS. THANKS, RICARDO.
YOU DID A GREAT JOB. ANY QUESTIONS FOR STAFF? SEEING NONE, WE'LL OPEN UP THE PUBLIC HEARING.
THAT WOULD BE YOUR TIME TO COME SPEAK ON THE PROJECT.
OR IF YOU HAVE ANY QUESTIONS. SEE NONE. WE'LL CLOSE THE PUBLIC HEARING AND BRING IT BACK.
WHAT WOULD THE COMMISSION LIKE TO DO HERE? I MAKE A MOTION TO DETERMINE THAT THE PROJECT IS CATEGORICALLY EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15, 15301, EXISTING FACILITY OF THE CEQA GUIDELINES.
THANK YOU. WE HAVE A MOTION. DO WE HAVE A SECOND? WE HAVE A MOTION AND A SECOND.
ALL IN FAVOR, SAY AYE. AYE. OPPOSED? PASSES UNANIMOUSLY.
NOW WE'LL MOVE ON TO THE PROJECT DETERMINATION.
MOTION TO APPROVE CONDITIONAL USE PERMIT NUMBER CUP24-016.
THANK YOU. WE HAVE A MOTION AND A SECOND. WE HAVE A MOTION AND A SECOND.
ALL IN FAVOR, SAY AYE. AYE AYE. OPPOSED? THAT PASSES UNANIMOUSLY ALSO.
NOW WE'RE GOING TO MOVE ON TO ITEM D ZONE VARIANCE NUMBER ZV23-002.
THANK YOU, CHAIRMAN SPYCHER. GOOD MORNING COMMISSIONERS.
MY NAME IS ANNA HERNANDEZ AND THE FINAL PROJECT BEFORE YOU TODAY IS ZONE VARIANCE NUMBER ZV23-002 AND MINOR SUBDIVISION NUMBER MS23-010 FOR THE APPLICANT, VIVIANA SANCHEZ. THIS PROJECT IS A REQUEST TO VARY FROM THE MAXIMUM DEPTH TO WIDTH RATIO REQUIREMENT FOR THE R-1 SINGLE FAMILY RESIDENTIAL ZONE DISTRICT, TO ALLOW FOR THE SUBDIVISION OF A ONE ACRE PARCEL INTO TWO PARCELS,
[00:40:03]
RESULTING IN PARCEL ONE HALF AN ACRE AND PARCEL TWO HALF AN ACRE.THIS PROJECT PROPOSES TO DEVIATE FROM THIS RATIO TO ALLOW FOR THE DEVELOPMENT OF ADDITIONAL RESIDENTIAL UNITS, AND TO BE CONSISTENT WITH THE ALLOWED DENSITY STANDARDS PER THE MERCED COUNTY GENERAL PLAN.
THIS IS THE VICINITY OF THE PROJECT SITE. THE SITE IS OUTLINED IN RED AND CONSISTS OF ONE ACRE OF A ONE ACRE PARCEL LOCATED ON THE EAST SIDE OF NORTH CODY AVENUE, APPROXIMATELY 350FT NORTH OF EAST HASKELL AVENUE AND THE URBAN COMMUNITY.
PARCEL TWO. APPROXIMATELY HALF AN ACRE WOULD CONSIST OF THE SINGLE FAMILY HOME, THE ACCESSORY DWELLING UNIT, AND THE DETACHED GARAGE ACCESS WOULD CONTINUE TO BE PROVIDED BY THE DRIVEWAY ON CODY AVENUE.
THE CURRENT PARCEL CONFIGURATION IS 132FT WIDE BY 330FT LONG.
THE PROPOSED SUBDIVISION WOULD RESULT IN TWO PARCELS THAT WOULD BE 66FT WIDE BY 330FT LONG.
THE PROJECT IS CONSISTENT WITH THE APPLICABLE GOALS AND POLICIES OF THE MERCED COUNTY GENERAL PLAN, INCLUDING, BUT NOT LIMITED TO. GOAL LU-1, LU 5.8, AND LU 5.3, AND THE OBJECTIVES AND POLICIES OF THE COMMUNITY PLAN, INCLUDING BUT NOT LIMITED TO OBJECTIVE LU 1.0 AND POLICY LU 1.1. THE PROPOSED VARIANCE WOULD FACILITATE THE SUBDIVISION, WHICH IN TURN WOULD ALLOW FOR THE DENSITY IN THE GENERAL PLAN 4 TO 8 DWELLING UNITS PER ACRE, AS ALLOWED BY THE LAND USE DESIGNATION, AND PROVIDES OPPORTUNITY FOR FUTURE RESIDENTIAL DEVELOPMENT.
THE PROJECT IS ALSO CONSISTENT WITH THE SUBDIVISION MAP ACT AND TITLE 17.
ADDITIONALLY, THE PROPOSED PARCEL SIZES WOULD MEET THE MINIMUM PARCEL SIZE REQUIREMENTS FOR THE R-1 ZONE DISTRICT AS OUTLINED IN SECTION 18.12.030 OF THE COUNTY ZONING CODE PURSUANT TO MERCED COUNTY ZONING CODE SECTION 18.126.050 AND GOVERNMENT CODE SECTION 65906. A VARIANCE MAY ONLY BE APPROVED AFTER THE PLANNING COMMISSION MAKES THE FOLLOWING REQUIRED FINDINGS.
THESE CAN BE FOUND ON PAGE NINE OF THE STAFF REPORT.
THIS PROPERTY IS UNUSUALLY LONG AND NARROW, WHICH ISN'T TYPICAL FOR THE ZONING.
THAT SHAPE MAKES IT HARD TO SUBDIVIDE THE LOT WITHOUT AFFECTING HOW IT CAN BE DEVELOPED AND REMAINING CONSISTENT WITH THE DENSITY STANDARDS FOR THE LOW DENSITY RESIDENTIAL LAND USE DESIGNATION. TWO STRICT CONFORMANCE WITH THE ZONING CODE WOULD PREVENT THE OWNER FROM SUBDIVIDING LIKE SIMILAR NEARBY PROPERTIES, SINCE SINGLE FAMILY HOMES ARE ALLOWED BY RIGHT.
THIS VARIANCE ENSURES THE PROPERTY HAS THE SAME DEVELOPMENT OPPORTUNITIES AS ITS NEIGHBORS.
THREE APPROVING THE VARIANCE WOULD NOT CONSTITUTE A SPECIAL PRIVILEGE.
IT WOULD NOT ALTER THE EXISTING LAND USE DESIGNATION OR THE DEVELOPMENT STANDARDS.
STAFF HAS DETERMINED THAT NO FURTHER ENVIRONMENTAL REVIEW IS REQUIRED PURSUANT TO SECTION 15183.
PROJECTS CONSISTENT WITH COMMUNITY PLAN, GENERAL PLAN, AND ZONING OF THE CEQA GUIDELINES.
THE PROJECT CONSISTS OF A VARIANCE TO THE MAXIMUM DEPTH TO WIDTH RATIO ALLOWED OUTLINED IN THE R1 ZONE DISTRICT TO ALLOW FOR THE SUBDIVISION OF A PARCEL INTO TWO PARCELS RESULTING IN PARCEL ONE HALF AN ACRE AND PARCEL TWO HALF AN ACRE.
THE SUBDIVISION WOULD MEET THE DENSITY STANDARDS OF THE LOW DENSITY RESIDENTIAL LAND USE DESIGNATION AND ALLOW FOR DIFFERENT TYPES OF HOUSING, AS ENCOURAGED BY THE COMMUNITY PLAN. THE PROPOSED PARCELS WOULD MEET THE MINIMUM PARCEL SIZES OF THE R1 ZONE DISTRICT AND HAVE ADEQUATE ACCESS AND SERVICES PROVIDED. FINALLY, THE PROJECT DOES NOT PRESENT ANY UNUSUAL CHARACTERISTICS OR UNANTICIPATED IMPACTS THAT WERE NOT PREVIOUSLY ANALYZED.
A NOTICE OF THE PUBLIC HEARING WAS PUBLISHED IN THE MERCED COUNTY TIMES AND MAILED TO PROPERTY OWNERS WITHIN 300FT OF THE PROJECT SITE ON JULY 10TH, 2025. NO COMMENTS WERE RECEIVED. TO CONCLUDE, STAFF HAS TWO RECOMMENDATIONS.
[00:45:05]
NUMBER ONE, DETERMINE THAT NO FURTHER ENVIRONMENTAL REVIEW IS REQUIRED PURSUANT TO SECTION 1583 PROJECT CONSISTENT WITH COMMUNITY PLAN, GENERAL PLAN OR ZONING OF THE CEQA GUIDELINES AND TWO, APPROVE ZONE VARIANCE NUMBER CV23-002 AND MINOR SUBDIVISION NUMBER MS23-010. BASED ON THE FINDINGS INCLUDED IN THE STAFF REPORT AND SUBJECT TO THE RECOMMENDED CONDITIONS OF APPROVAL.THIS CONCLUDES STAFF'S PRESENTATION AND I'M AVAILABLE FOR QUESTIONS.
THANK YOU. DO WE HAVE ANY QUESTIONS FOR STAFF? SEEING NONE, WE'LL OPEN UP THE PUBLIC HEARING. NOW, IF ANY MEMBER OF THE PUBLIC WOULD LIKE TO COME SPEAK ON THIS. THAT WOULD BE YOUR OPPORTUNITY. SEEING NONE, WE'RE GOING TO CLOSE THE PUBLIC HEARING AND MOVE FORWARD.
WHAT'S THE WILL OF THE OF THE COUNCIL HERE? COMMISSION.
I'LL MAKE THE MOTION THAT THE COMMISSION DETERMINES THAT NO FURTHER ENVIRONMENTAL REVIEW IS REQUIRED PURSUANT TO SECTION 15183 PROJECTS CONSISTENT WITH THE COMMUNITY PLAN, GENERAL PLAN, OR ZONING OF THE CEQA GUIDELINES.
THANK YOU. WE HAVE A MOTION. DO WE HAVE A SECOND? SECOND, WE HAVE A MOTION AND TWO SECONDS.
ALL IN FAVOR, SAY AYE. AYE. OPPOSED. PASSES UNANIMOUSLY.
NUMBER ZV23-002, MINOR SUBDIVISION NUMBER MS23-010.
BASED ON THE FINDINGS INCLUDED IN THE STAFF REPORT AND SUBJECT TO THE RECOMMENDED CONDITIONS OF APPROVAL. THANK YOU. WE HAVE A MOTION. DO WE HAVE A SECOND? SECOND, WE HAVE A MOTION AND A SECOND. ALL IN FAVOR, SAY AYE.
AYE. OPPOSED? THAT PASSES UNANIMOUSLY ALSO. THANK YOU GUYS.
NOW MOVING ON TO COMMISSIONER ACTION ITEMS. APPEARS WE HAVE NONE.
[8. DIRECTOR'S REPORT]
DIRECTOR'S REPORT. YEAH. REAL QUICK I JUST WANT TO CONGRATULATE BOTH YANIRI AND RICARDO FOR THEIR FIRST COMMISSION REPORTS.AND GREAT JOB TO YOU BOTH. THANK YOU. COMMISSIONER COMMENTS.
SEEING NONE WILL ADJOURN. THANK YOU EVERYONE.